Tampilkan postingan dengan label update. Tampilkan semua postingan
Tampilkan postingan dengan label update. Tampilkan semua postingan
Rabu, 16 Maret 2016
Further Update Avanti
We just received these images from our friend in Holland, Pieter van der Aa. Heres a new Avanti under construction, just about ready to get ... Read MorePassage door update 2
All five passage doors are hung in their openings and have two coats of urethane finish on them. Another fairly large job can be, for the mo... Read MoreJumat, 11 Maret 2016

Guest cabin dressing room update
The six cabinet doors are finished and I have two coats of Urethane on all the wood in the guest cabin dressing room. I also have the sink b... Read MoreMinggu, 06 Maret 2016
.jpg)
An update of sorts
During my absence from the blogging on my boat build, Ive come to the conclusion thats is a darn tough thing to get work done on a boat whil... Read MoreRabu, 02 Maret 2016
