Tampilkan postingan dengan label update. Tampilkan semua postingan
Tampilkan postingan dengan label update. Tampilkan semua postingan

Sabtu, 19 Maret 2016

Update on Didi Sport 15 and Didi 950

I have recently added two new radius chine plywood designs to our range and wrote about them on this blog. Here are updates on both boats. Y... Read More

Rabu, 16 Maret 2016

Further Update Avanti

We just received these images from our friend in Holland, Pieter van der Aa. Heres a new Avanti under construction, just about ready to get ... Read More

Passage door update 2

All five passage doors are hung in their openings and have two coats of urethane finish on them. Another fairly large job can be, for the mo... Read More

Jumat, 11 Maret 2016

Guest cabin dressing room update

The six cabinet doors are finished and I have two coats of Urethane on all the wood in the guest cabin dressing room. I also have the sink b... Read More

Minggu, 06 Maret 2016

An update of sorts

During my absence from the blogging on my boat build, Ive come to the conclusion thats is a darn tough thing to get work done on a boat whil... Read More

Rabu, 02 Maret 2016

Hogfish Life the past few months new skiffs Stoner Boatworks update lots more

Will try and catch up on a bunch of things going on with the Hogfish, Rachel and I. We have sailed as far south as Grenada and are now ancho... Read More