Tampilkan postingan dengan label 2. Tampilkan semua postingan
Tampilkan postingan dengan label 2. Tampilkan semua postingan

Rabu, 16 Maret 2016

Passage door update 2

All five passage doors are hung in their openings and have two coats of urethane finish on them. Another fairly large job can be, for the mo... Read More

Senin, 14 Maret 2016

Port Townsend Wooden Boat Festival 2012 day 2

Saturday, the busiest day of the Festival. I headed over to sign up for a rowing/sailing trip aboard the longboats. These longboats are repl... Read More

Kamis, 10 Maret 2016

Arctic Tern x 2

Though you will find a building library of small boat designs profiled here, the Voyage Ethereal is as much about the people as the boats. T... Read More

Senin, 07 Maret 2016

Sucia Small Boat Rendezvous 2014 Day 2

Saturday morning, after sleeping in a bit late, I fired up the Kelly Kettle while Tim did some writing.  Our Kelly Kettle, by the way, was a... Read More

Jumat, 04 Maret 2016

Mahogany Decked Seats Part 2

After all the mahogany decking was laid the next task was to apply caulking to the seams. There are two ways this can be done. The tradition... Read More

Rabu, 02 Maret 2016

Guest cabin dressing room update 2

The last few weeks have found me getting the Carver boat ready for its new owner so not much has been getting done on the boat build. Now th... Read More